{"id":7608,"date":"2017-06-05T17:51:33","date_gmt":"2017-06-05T17:51:33","guid":{"rendered":"https:\/\/emi-bg.com\/%d1%86%d0%b5%d0%bd%d0%b0-%d0%b7%d0%b0%d0%b4%d1%8a%d0%bb%d0%b6%d0%b5%d0%bd%d0%b8%d1%8f-%d0%ba%d1%8a%d0%bc-%d0%be%d0%b1%d1%89%d0%b5%d1%81%d1%82%d0%b2%d0%be%d1%82%d0%be-%d0%b4%d0%b2%d0%b5-%d0%b3\/"},"modified":"2021-08-11T17:53:22","modified_gmt":"2021-08-11T17:53:22","slug":"obligations-to-society-price-two-years-later","status":"publish","type":"post","link":"https:\/\/www.emi-bg.com\/en\/obligations-to-society-price-two-years-later\/","title":{"rendered":"\u201cObligations to Society\u201d Price \u2013 Two Years Later"},"content":{"rendered":"<h3><strong>Change in price formation components of \u201cObligations to Society\u201d price for 2015, 2016, and 2017<\/strong><\/h3>\n<p style=\"text-align: justify;\">In accordance with the rules of procedure, an\u00a0<a href=\"http:\/\/www.dker.bg\/newsbg.php?n=2889\">open meeting was held on 06 June 2017<em>(Bulgarian version)<\/em><\/a>\u00a0and a\u00a0<a href=\"http:\/\/www.dker.bg\/newsbg.php?n=2891\">public consultation on 13 June 2017<em>(Bulgarian version)<\/em><\/a>, concerning adopted report for approval of prices in the Electricity Sector, including the components and the method of calculating the \u201cObligations to Society\u201d price, which is paid by all customers. According to the rules, the final price decision in the sector is adopted after an open meeting and a public consultation.<\/p>\n<p style=\"text-align: justify;\">\u201cObligations to Society\u201d price reflects the difference between electricity market price and the prices at which the public provider purchases electricity under Art. 93a and Art. 94 of the Energy Act, as well as costs arising from imposed obligations, related to protection of sites, which are identified as critical infrastructure in the energy sector.<\/p>\n<p style=\"text-align: justify;\">With amendments to the Energy Act, effective 24 July 2015, a special \u201cElectricity System Security\u201d Fund (ESSF) was set up to manage the funds to cover the costs incurred by the public provider arising from its obligations to purchase the energy produced from renewable sources, determined by a decision of the EWRC, including also past regulatory periods.<\/p>\n<p style=\"text-align: justify;\">Money in the Fund is raised by means of 5% contributions made by electricity producers, electricity and natural gas network transmission operators, and operators of natural gas storage facilities. For the purposes of price regulation, in the composition of\u00a0recognised\u00a0costs, the EWRC does not include the cost of contributions to the Fund.<\/p>\n<p style=\"text-align: justify;\">The Fund also receives the revenues obtained from the allowances sale auctions under Art. 57, para. 1 of the Climate Change Mitigation Act, which are used for the development of renewable energy sources, interest income, including overdue installments, donations, revenues from statistical transfers of energy from renewable sources which are used for the development of renewable energy sources.<\/p>\n<h3><strong>Estimated annual revenues, as well as the corresponding costs in determining the price \u201cObligations to Society\u201d are determined by the EWRC<\/strong><\/h3>\n<p style=\"text-align: justify;\">Since the creation of this fund, other costs have been included in the \u201cObligations to Society\u201d price, covered by the Fund&#8217;s revenue, namely:<\/p>\n<ul style=\"margin-top: 0in;\">\n<li>compensation of the public provider for costs, not included during past regulatory periods,<\/li>\n<li>compensation of the public provider for the 5% contribution due to the fund by producers with long-term power purchase agreements (LTPPA),<\/li>\n<li>compensation of the public provider for the green energy component rebates provided for in the Ordinance on Reduction of Renewable Energy Costs.<\/li>\n<li>compensation of the public provider for the green energy price component rebates, provided for in the Ordinance on Reduction of the Burden of renewable energy costs.<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">In its price decisions of\u00a02015, the\u00a0EWRC\u00a0provided for funds from the ESSF to be used to offset the difference between the prices that the public provider would pay under LTPPA before and after entry into force of the agreements to change the availability prices to the amount of BGN 89 375 thousand.<\/p>\n<p style=\"text-align: justify;\">EWRC\u2019s\u00a0forecasts for the three years include an average annual fund revenues of over BGN 463 million and average annual costs amounting over BGN\u00a0262\u00a0million. Average annual cost reduction for diminishing \u201cObligations to Society\u201d (\u201cOS\u201d) price increase is over BGN 201 million, as for the first year only, the remainder for decrease of OS is lower, as can be seen in the table:<\/p>\n<table style=\"width: 387.75pt; margin-left: 3.5pt; border-collapse: collapse; mso-yfti-tbllook: 1184; mso-padding-alt: 0in 0in 0in 0in;\" width=\"517\">\n<tbody>\n<tr>\n<td width=\"297\">&nbsp;<\/td>\n<td width=\"64\">&nbsp;<\/td>\n<td colspan=\"2\" width=\"156\">in thousand BGN<\/td>\n<\/tr>\n<tr>\n<td width=\"297\"><strong><em>ESSF<\/em><\/strong><\/td>\n<td width=\"64\"><strong><em>2015<\/em><\/strong><\/td>\n<td width=\"72\"><strong><em>2016<\/em><\/strong><\/td>\n<td width=\"84\"><strong><em>2017<\/em><\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"297\">Estimated annual revenues<\/td>\n<td width=\"64\">434 984<\/td>\n<td width=\"72\">479 206<\/td>\n<td width=\"84\">477 275<\/td>\n<\/tr>\n<tr>\n<td width=\"297\">Estimated annual costs<\/td>\n<td width=\"64\">318 586<\/td>\n<td width=\"72\">233 971<\/td>\n<td width=\"84\">234 122<\/td>\n<\/tr>\n<tr>\n<td width=\"297\"><strong>Remainder for decreasing of \u201cOS\u201d price<\/strong><\/td>\n<td width=\"64\"><strong>-116 398<\/strong><\/td>\n<td width=\"72\"><strong>-245 235<\/strong><\/td>\n<td width=\"84\"><strong>-243 153<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"text-align: justify;\">\nThus, through the revenues gained by the EESF, EWRC has the opportunity to reduce the price \u201cObligations to Society\u201d annually.<\/p>\n<p style=\"text-align: justify;\">The amount of the costs that will be refunded by all customers through \u201cOS\u201d depends to a large extent on the average market price \u2013 the higher it is, the less the share of the annual costs for mandatory purchase will be included in the \u201cObligations to Society\u201d price. For the three-year period, the EWRC sets an average market price of 73 BGN \/ MWh for 2015 and 70 BGN \/ MWh for 2016 and 2017 respectively.<\/p>\n<p style=\"text-align: justify;\">Total energy quantity subject to mandatory purchase is slightly higher for 2015 &#8211; 15 091 GWh, as for the next two years it is set at 14 244 GWh in 2016 and 14\u00a0289 GWh in 2017, or the reduction for 2017 is about 5% compared to 2015.<\/p>\n<p style=\"text-align: justify;\">The change in the total quantity in these years is dependent on the change in the quantities of &#8220;ES-3C Maritza East 1&#8221; EOOD and of the CHP plants, as the other types of power plants participate with equal amounts of electricity for the period under consideration .<\/p>\n<p style=\"text-align: justify;\">Cogeneration plants that sell electricity under feed-in tariff are included with\u00a03 163\u00a0GWh\u00a0in 2015,\u00a02\u00a0813 GWh\u00a0in 2016, and\u00a02 796\u00a0GWh\u00a0I 2017, or there is 12% reduction in the last year, compared to 2015.<\/p>\n<p style=\"text-align: justify;\">Mandatory purchase of electricity costs, involved in \u201cOS\u201d price formation change in the period, as follows:<\/p>\n<table style=\"width: 696.4pt; margin-left: 3.25pt; border-collapse: collapse; mso-yfti-tbllook: 1184; mso-padding-alt: 0in 0in 0in 0in;\" width=\"929\">\n<tbody>\n<tr>\n<td width=\"26\">\u2116<\/td>\n<td width=\"508\"><strong>Types of Producers<\/strong><\/td>\n<td width=\"103\"><strong>Measure<\/strong><\/td>\n<td width=\"107\"><strong>1\u00a0<\/strong><strong>August\u00a02015<\/strong><\/td>\n<td width=\"95\"><strong>1\u00a0<\/strong><strong>July\u00a02016<\/strong><\/td>\n<td width=\"90\"><strong>1\u00a0<\/strong><strong>July\u00a02017<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"26\">1<\/td>\n<td width=\"508\">\u201eAES-3C Maritza East\u00a01\u201c\u00a0EOOD<\/td>\n<td width=\"103\">thousand BGN<\/td>\n<td width=\"107\">492 913<\/td>\n<td width=\"95\">535 720<\/td>\n<td width=\"90\">542 815<\/td>\n<\/tr>\n<tr>\n<td width=\"26\">2<\/td>\n<td width=\"508\">\u201eContourGlobal Maritsa East\u00a03\u201c\u00a0AD<\/td>\n<td width=\"103\">thousand BGN<\/td>\n<td width=\"107\">442 400<\/td>\n<td width=\"95\">492 001<\/td>\n<td width=\"90\">490 450<\/td>\n<\/tr>\n<tr>\n<td width=\"26\">3<\/td>\n<td width=\"508\">Renewable sources<\/td>\n<td width=\"103\">thousand BGN<\/td>\n<td width=\"107\">1 005 333<\/td>\n<td width=\"95\">1 019 434<\/td>\n<td width=\"90\">1 022 934<\/td>\n<\/tr>\n<tr>\n<td width=\"26\">4<\/td>\n<td width=\"508\">CHP plants<\/td>\n<td width=\"103\">thousand BGN<\/td>\n<td width=\"107\">479 279<\/td>\n<td width=\"95\">370 420<\/td>\n<td width=\"90\">419 987<\/td>\n<\/tr>\n<tr>\n<td width=\"26\">5<\/td>\n<td width=\"508\">Critical infrastructure costs<\/td>\n<td width=\"103\">thousand BGN<\/td>\n<td width=\"107\">3 521<\/td>\n<td width=\"95\">&nbsp;<\/td>\n<td width=\"90\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"26\"><strong>6<\/strong><\/td>\n<td width=\"508\"><strong>Total costs:<\/strong><\/td>\n<td width=\"103\"><strong>thousand BGN<\/strong><\/td>\n<td width=\"107\"><strong>2 423 446<\/strong><\/td>\n<td width=\"95\"><strong>2 417 575<\/strong><\/td>\n<td width=\"90\"><strong>2 476 186<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin-bottom: .0001pt; text-align: justify;\">The costs of electricity from renewable sources are with the highest average annual share for the three years\u00a0analysed\u00a0&#8211; about 42% of the total costs, followed by the two plants with LTPPAs having 41%. The electricity costs of both plants with LTPPAs vary depending on the terms of the agreements, while feed-in tariffs of the renewable sources have a negligible annual change due to the structure of production and annually adjusted biomass prices.<\/p>\n<p style=\"text-align: justify;\">The average annual share of electricity costs from CHP plants is 17%. Costs that result from the feed-in tariff set by the EWRC for CHP plants are most affected by natural gas price, including the approved individual price formation components and the surcharge added to the individual price.<\/p>\n<p style=\"text-align: justify;\"><strong>Average annual prices<\/strong>\u00a0for the three years from 2015 up until now included in price formation are:\u00a0130.58 BGN\/MWh for the two coal-fired power plants with long-term agreement, 275.96 BGN\/MWh for the renewable energy plants and 144.49 BGN\/MWh for the electricity of CHP plants respectively.<\/p>\n<p style=\"text-align: justify;\">The change of the different price formation components, which affect the final level of \u201cObligations to Society\u201d price, are summarised in the following table:<\/p>\n<table style=\"width: 688.95pt; margin-left: 3.5pt; border-collapse: collapse; mso-yfti-tbllook: 1184; mso-padding-alt: 0in 0in 0in 0in;\" width=\"919\">\n<tbody>\n<tr>\n<td width=\"27\"><strong>\u2116<\/strong><\/td>\n<td width=\"450\"><strong>Price Formation Components<\/strong><\/td>\n<td width=\"104\"><strong>Measure<\/strong><\/td>\n<td width=\"110\"><strong>1\u00a0<\/strong><strong>August\u00a02015<\/strong><\/td>\n<td width=\"117\"><strong>1\u00a0<\/strong><strong>July\u00a02016<\/strong><\/td>\n<td width=\"111\"><strong>1\u00a0<\/strong><strong>July\u00a02017<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"27\">1<\/td>\n<td width=\"450\">Energy purchased under Art.93\u0430\u00a0and Art.94\u00a0of EA<\/td>\n<td width=\"104\">MWh<\/td>\n<td width=\"110\">15 090 835<\/td>\n<td width=\"117\">14 244 443<\/td>\n<td width=\"111\">14 289 448<\/td>\n<\/tr>\n<tr>\n<td width=\"27\">2<\/td>\n<td width=\"450\">Annual energy value purchased under Art. 93a and Art. 94<\/td>\n<td width=\"104\">thousand BGN<\/td>\n<td width=\"110\">2 419 925<\/td>\n<td width=\"117\">2 417 575<\/td>\n<td width=\"111\">2 476 186<\/td>\n<\/tr>\n<tr>\n<td width=\"27\">3<\/td>\n<td width=\"450\">Average price of the energy\u00a0purchased under Art. 93a and Art. 94 of EA<\/td>\n<td width=\"104\">BGN\/MWh<\/td>\n<td width=\"110\">160,36<\/td>\n<td width=\"117\">169,72<\/td>\n<td width=\"111\">173,29<\/td>\n<\/tr>\n<tr>\n<td width=\"27\">4<\/td>\n<td width=\"450\">Average market price<\/td>\n<td width=\"104\">BGN\/MWh<\/td>\n<td width=\"110\">73,00<\/td>\n<td width=\"117\">70,00<\/td>\n<td width=\"111\">70,00<\/td>\n<\/tr>\n<tr>\n<td width=\"27\">5<\/td>\n<td width=\"450\">Value of the energy purchased at average market price<\/td>\n<td width=\"104\">thousand BGN<\/td>\n<td width=\"110\">1 101 631<\/td>\n<td width=\"117\">997 111<\/td>\n<td width=\"111\">1 000 261<\/td>\n<\/tr>\n<tr>\n<td width=\"27\">6<\/td>\n<td width=\"450\">Value of the energy that cannot be covered by average market price<\/td>\n<td width=\"104\">thousand BGN<\/td>\n<td width=\"110\">1 318 294<\/td>\n<td width=\"117\">1 420 464<\/td>\n<td width=\"111\">1 475 925<\/td>\n<\/tr>\n<tr>\n<td width=\"27\">7<\/td>\n<td width=\"450\"><strong>\u201cObligations to Society\u201d price with no SESF offsetting<\/strong><\/td>\n<td width=\"104\"><strong>BGN\/MWh<\/strong><\/td>\n<td width=\"110\"><strong>40,28<\/strong><\/td>\n<td width=\"117\"><strong>43,11<\/strong><\/td>\n<td width=\"111\"><strong>44,53<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"27\">8<\/td>\n<td width=\"450\">Amount for offsetting of\u00a0\u201cObligations to Society\u201d costs from SESF<\/td>\n<td width=\"104\">thousand BGN<\/td>\n<td width=\"110\">-116 398<\/td>\n<td width=\"117\">-245 235<\/td>\n<td width=\"111\">-243 153<\/td>\n<\/tr>\n<tr>\n<td width=\"27\">9<\/td>\n<td width=\"450\">Value of the energy that cannot be covered by average market price decreased with\u00a0SESF revenues<\/td>\n<td width=\"104\">thousand BGN<\/td>\n<td width=\"110\">1 201 896<\/td>\n<td width=\"117\">1 175 229<\/td>\n<td width=\"111\">1 232 772<\/td>\n<\/tr>\n<tr>\n<td width=\"27\">10<\/td>\n<td width=\"450\">Estimated annual energy quantities in the country and imports<\/td>\n<td width=\"104\">MWh<\/td>\n<td width=\"110\">32 726 000<\/td>\n<td width=\"117\">32 949 489<\/td>\n<td width=\"111\">33 141 348<\/td>\n<\/tr>\n<tr>\n<td width=\"27\">11<\/td>\n<td width=\"450\">Critical infrastructure costs<\/td>\n<td width=\"104\">thousand BGN<\/td>\n<td width=\"110\">3 521<\/td>\n<td width=\"117\">0<\/td>\n<td width=\"111\">0<\/td>\n<\/tr>\n<tr>\n<td width=\"27\">12<\/td>\n<td width=\"450\"><strong>&#8220;<\/strong><strong>Obligations to Society&#8221;<\/strong><strong>\u00a0price<\/strong><\/td>\n<td width=\"104\"><strong>BGN\/MWh<\/strong><\/td>\n<td width=\"110\"><strong>36,83<\/strong><\/td>\n<td width=\"117\"><strong>35,67<\/strong><\/td>\n<td width=\"111\"><strong>37,20<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"text-align: justify;\">For more information see EWRC\u2019s decisions\u00a0<a href=\"http:\/\/www.dker.bg\/docsbg.php?d=3\">here\u00a0<em>(Bulgarian version)<\/em><\/a>.<\/p>\n<p style=\"font-weight: 400;\">\n<p style=\"text-align: justify;\">\n","protected":false},"excerpt":{"rendered":"<p>Change in price formation components of \u201cObligations to Society\u201d price for 2015, 2016, and 2017 In accordance with the rules of procedure, an\u00a0open meeting was held on 06 June 2017(Bulgarian version)\u00a0and a\u00a0public consultation on 13 June 2017(Bulgarian version), concerning adopted report for approval of prices in the Electricity Sector, including the components and the method &hellip;<\/p>\n<p class=\"read-more\"> <a class=\"\" href=\"https:\/\/www.emi-bg.com\/en\/obligations-to-society-price-two-years-later\/\"> <span class=\"screen-reader-text\">\u201cObligations to Society\u201d Price \u2013 Two Years Later<\/span> Read More &raquo;<\/a><\/p>\n","protected":false},"author":1,"featured_media":7606,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"sfsi_plus_gutenberg_text_before_share":"","sfsi_plus_gutenberg_show_text_before_share":"","sfsi_plus_gutenberg_icon_type":"","sfsi_plus_gutenberg_icon_alignemt":"","sfsi_plus_gutenburg_max_per_row":"","_monsterinsights_skip_tracking":false,"site-sidebar-layout":"default","site-content-layout":"default","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","footnotes":""},"categories":[18],"tags":[],"class_list":["post-7608","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-analizi-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>\u201cObligations to Society\u201d Price \u2013 Two Years Later - \u0415\u041c\u0418 \u0411\u044a\u043b\u0433\u0430\u0440\u0438\u044f<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.emi-bg.com\/en\/obligations-to-society-price-two-years-later\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u201cObligations to Society\u201d Price \u2013 Two Years Later - \u0415\u041c\u0418 \u0411\u044a\u043b\u0433\u0430\u0440\u0438\u044f\" \/>\n<meta property=\"og:description\" content=\"Change in price formation components of \u201cObligations to Society\u201d price for 2015, 2016, and 2017 In accordance with the rules of procedure, an\u00a0open meeting was held on 06 June 2017(Bulgarian version)\u00a0and a\u00a0public consultation on 13 June 2017(Bulgarian version), concerning adopted report for approval of prices in the Electricity Sector, including the components and the method &hellip; \u201cObligations to Society\u201d Price \u2013 Two Years Later Read More &raquo;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.emi-bg.com\/en\/obligations-to-society-price-two-years-later\/\" \/>\n<meta property=\"og:site_name\" content=\"\u0415\u041c\u0418 \u0411\u044a\u043b\u0433\u0430\u0440\u0438\u044f\" \/>\n<meta property=\"article:published_time\" content=\"2017-06-05T17:51:33+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-08-11T17:53:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.emi-bg.com\/wp-content\/uploads\/2021\/08\/ee1-2.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"546\" \/>\n\t<meta property=\"og:image:height\" content=\"228\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"EMI\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"EMI\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.emi-bg.com\\\/en\\\/obligations-to-society-price-two-years-later\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.emi-bg.com\\\/en\\\/obligations-to-society-price-two-years-later\\\/\"},\"author\":{\"name\":\"EMI\",\"@id\":\"https:\\\/\\\/www.emi-bg.com\\\/#\\\/schema\\\/person\\\/2a1aaa149027d9082465130781fdfae8\"},\"headline\":\"\u201cObligations to Society\u201d Price \u2013 Two Years Later\",\"datePublished\":\"2017-06-05T17:51:33+00:00\",\"dateModified\":\"2021-08-11T17:53:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.emi-bg.com\\\/en\\\/obligations-to-society-price-two-years-later\\\/\"},\"wordCount\":1159,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.emi-bg.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.emi-bg.com\\\/en\\\/obligations-to-society-price-two-years-later\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.emi-bg.com\\\/wp-content\\\/uploads\\\/2021\\\/08\\\/ee1-2.jpg\",\"articleSection\":[\"Analysis\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.emi-bg.com\\\/en\\\/obligations-to-society-price-two-years-later\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.emi-bg.com\\\/en\\\/obligations-to-society-price-two-years-later\\\/\",\"url\":\"https:\\\/\\\/www.emi-bg.com\\\/en\\\/obligations-to-society-price-two-years-later\\\/\",\"name\":\"\u201cObligations to Society\u201d Price \u2013 Two Years Later - \u0415\u041c\u0418 \u0411\u044a\u043b\u0433\u0430\u0440\u0438\u044f\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.emi-bg.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.emi-bg.com\\\/en\\\/obligations-to-society-price-two-years-later\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.emi-bg.com\\\/en\\\/obligations-to-society-price-two-years-later\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.emi-bg.com\\\/wp-content\\\/uploads\\\/2021\\\/08\\\/ee1-2.jpg\",\"datePublished\":\"2017-06-05T17:51:33+00:00\",\"dateModified\":\"2021-08-11T17:53:22+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.emi-bg.com\\\/en\\\/obligations-to-society-price-two-years-later\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.emi-bg.com\\\/en\\\/obligations-to-society-price-two-years-later\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.emi-bg.com\\\/en\\\/obligations-to-society-price-two-years-later\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.emi-bg.com\\\/wp-content\\\/uploads\\\/2021\\\/08\\\/ee1-2.jpg\",\"contentUrl\":\"https:\\\/\\\/www.emi-bg.com\\\/wp-content\\\/uploads\\\/2021\\\/08\\\/ee1-2.jpg\",\"width\":546,\"height\":228},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.emi-bg.com\\\/en\\\/obligations-to-society-price-two-years-later\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u041d\u0430\u0447\u0430\u043b\u043e\",\"item\":\"https:\\\/\\\/www.emi-bg.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u201cObligations to Society\u201d Price \u2013 Two Years Later\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.emi-bg.com\\\/#website\",\"url\":\"https:\\\/\\\/www.emi-bg.com\\\/\",\"name\":\"\u0415\u041c\u0418 \u0411\u044a\u043b\u0433\u0430\u0440\u0438\u044f\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.emi-bg.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.emi-bg.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.emi-bg.com\\\/#organization\",\"name\":\"\u0415\u041c\u0418 \u0411\u044a\u043b\u0433\u0430\u0440\u0438\u044f\",\"url\":\"https:\\\/\\\/www.emi-bg.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.emi-bg.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.emi-bg.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/EMI_LOGO_WHITEBG.png\",\"contentUrl\":\"https:\\\/\\\/www.emi-bg.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/EMI_LOGO_WHITEBG.png\",\"width\":350,\"height\":102,\"caption\":\"\u0415\u041c\u0418 \u0411\u044a\u043b\u0433\u0430\u0440\u0438\u044f\"},\"image\":{\"@id\":\"https:\\\/\\\/www.emi-bg.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.emi-bg.com\\\/#\\\/schema\\\/person\\\/2a1aaa149027d9082465130781fdfae8\",\"name\":\"EMI\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fef46b8f08c51eb79b8689ab2132cb80c6a562e8ccb3d910434fde2f792a6177?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fef46b8f08c51eb79b8689ab2132cb80c6a562e8ccb3d910434fde2f792a6177?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fef46b8f08c51eb79b8689ab2132cb80c6a562e8ccb3d910434fde2f792a6177?s=96&d=mm&r=g\",\"caption\":\"EMI\"},\"sameAs\":[\"https:\\\/\\\/emi-bg.com\"],\"url\":\"https:\\\/\\\/www.emi-bg.com\\\/en\\\/author\\\/emi\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"\u201cObligations to Society\u201d Price \u2013 Two Years Later - \u0415\u041c\u0418 \u0411\u044a\u043b\u0433\u0430\u0440\u0438\u044f","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.emi-bg.com\/en\/obligations-to-society-price-two-years-later\/","og_locale":"en_US","og_type":"article","og_title":"\u201cObligations to Society\u201d Price \u2013 Two Years Later - \u0415\u041c\u0418 \u0411\u044a\u043b\u0433\u0430\u0440\u0438\u044f","og_description":"Change in price formation components of \u201cObligations to Society\u201d price for 2015, 2016, and 2017 In accordance with the rules of procedure, an\u00a0open meeting was held on 06 June 2017(Bulgarian version)\u00a0and a\u00a0public consultation on 13 June 2017(Bulgarian version), concerning adopted report for approval of prices in the Electricity Sector, including the components and the method &hellip; \u201cObligations to Society\u201d Price \u2013 Two Years Later Read More &raquo;","og_url":"https:\/\/www.emi-bg.com\/en\/obligations-to-society-price-two-years-later\/","og_site_name":"\u0415\u041c\u0418 \u0411\u044a\u043b\u0433\u0430\u0440\u0438\u044f","article_published_time":"2017-06-05T17:51:33+00:00","article_modified_time":"2021-08-11T17:53:22+00:00","og_image":[{"width":546,"height":228,"url":"https:\/\/www.emi-bg.com\/wp-content\/uploads\/2021\/08\/ee1-2.jpg","type":"image\/jpeg"}],"author":"EMI","twitter_card":"summary_large_image","twitter_misc":{"Written by":"EMI","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.emi-bg.com\/en\/obligations-to-society-price-two-years-later\/#article","isPartOf":{"@id":"https:\/\/www.emi-bg.com\/en\/obligations-to-society-price-two-years-later\/"},"author":{"name":"EMI","@id":"https:\/\/www.emi-bg.com\/#\/schema\/person\/2a1aaa149027d9082465130781fdfae8"},"headline":"\u201cObligations to Society\u201d Price \u2013 Two Years Later","datePublished":"2017-06-05T17:51:33+00:00","dateModified":"2021-08-11T17:53:22+00:00","mainEntityOfPage":{"@id":"https:\/\/www.emi-bg.com\/en\/obligations-to-society-price-two-years-later\/"},"wordCount":1159,"commentCount":0,"publisher":{"@id":"https:\/\/www.emi-bg.com\/#organization"},"image":{"@id":"https:\/\/www.emi-bg.com\/en\/obligations-to-society-price-two-years-later\/#primaryimage"},"thumbnailUrl":"https:\/\/www.emi-bg.com\/wp-content\/uploads\/2021\/08\/ee1-2.jpg","articleSection":["Analysis"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.emi-bg.com\/en\/obligations-to-society-price-two-years-later\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.emi-bg.com\/en\/obligations-to-society-price-two-years-later\/","url":"https:\/\/www.emi-bg.com\/en\/obligations-to-society-price-two-years-later\/","name":"\u201cObligations to Society\u201d Price \u2013 Two Years Later - \u0415\u041c\u0418 \u0411\u044a\u043b\u0433\u0430\u0440\u0438\u044f","isPartOf":{"@id":"https:\/\/www.emi-bg.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.emi-bg.com\/en\/obligations-to-society-price-two-years-later\/#primaryimage"},"image":{"@id":"https:\/\/www.emi-bg.com\/en\/obligations-to-society-price-two-years-later\/#primaryimage"},"thumbnailUrl":"https:\/\/www.emi-bg.com\/wp-content\/uploads\/2021\/08\/ee1-2.jpg","datePublished":"2017-06-05T17:51:33+00:00","dateModified":"2021-08-11T17:53:22+00:00","breadcrumb":{"@id":"https:\/\/www.emi-bg.com\/en\/obligations-to-society-price-two-years-later\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.emi-bg.com\/en\/obligations-to-society-price-two-years-later\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.emi-bg.com\/en\/obligations-to-society-price-two-years-later\/#primaryimage","url":"https:\/\/www.emi-bg.com\/wp-content\/uploads\/2021\/08\/ee1-2.jpg","contentUrl":"https:\/\/www.emi-bg.com\/wp-content\/uploads\/2021\/08\/ee1-2.jpg","width":546,"height":228},{"@type":"BreadcrumbList","@id":"https:\/\/www.emi-bg.com\/en\/obligations-to-society-price-two-years-later\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u041d\u0430\u0447\u0430\u043b\u043e","item":"https:\/\/www.emi-bg.com\/en\/"},{"@type":"ListItem","position":2,"name":"\u201cObligations to Society\u201d Price \u2013 Two Years Later"}]},{"@type":"WebSite","@id":"https:\/\/www.emi-bg.com\/#website","url":"https:\/\/www.emi-bg.com\/","name":"\u0415\u041c\u0418 \u0411\u044a\u043b\u0433\u0430\u0440\u0438\u044f","description":"","publisher":{"@id":"https:\/\/www.emi-bg.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.emi-bg.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.emi-bg.com\/#organization","name":"\u0415\u041c\u0418 \u0411\u044a\u043b\u0433\u0430\u0440\u0438\u044f","url":"https:\/\/www.emi-bg.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.emi-bg.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.emi-bg.com\/wp-content\/uploads\/2025\/06\/EMI_LOGO_WHITEBG.png","contentUrl":"https:\/\/www.emi-bg.com\/wp-content\/uploads\/2025\/06\/EMI_LOGO_WHITEBG.png","width":350,"height":102,"caption":"\u0415\u041c\u0418 \u0411\u044a\u043b\u0433\u0430\u0440\u0438\u044f"},"image":{"@id":"https:\/\/www.emi-bg.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.emi-bg.com\/#\/schema\/person\/2a1aaa149027d9082465130781fdfae8","name":"EMI","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/fef46b8f08c51eb79b8689ab2132cb80c6a562e8ccb3d910434fde2f792a6177?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/fef46b8f08c51eb79b8689ab2132cb80c6a562e8ccb3d910434fde2f792a6177?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/fef46b8f08c51eb79b8689ab2132cb80c6a562e8ccb3d910434fde2f792a6177?s=96&d=mm&r=g","caption":"EMI"},"sameAs":["https:\/\/emi-bg.com"],"url":"https:\/\/www.emi-bg.com\/en\/author\/emi\/"}]}},"_links":{"self":[{"href":"https:\/\/www.emi-bg.com\/en\/wp-json\/wp\/v2\/posts\/7608","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emi-bg.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emi-bg.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emi-bg.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emi-bg.com\/en\/wp-json\/wp\/v2\/comments?post=7608"}],"version-history":[{"count":1,"href":"https:\/\/www.emi-bg.com\/en\/wp-json\/wp\/v2\/posts\/7608\/revisions"}],"predecessor-version":[{"id":7609,"href":"https:\/\/www.emi-bg.com\/en\/wp-json\/wp\/v2\/posts\/7608\/revisions\/7609"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emi-bg.com\/en\/wp-json\/wp\/v2\/media\/7606"}],"wp:attachment":[{"href":"https:\/\/www.emi-bg.com\/en\/wp-json\/wp\/v2\/media?parent=7608"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emi-bg.com\/en\/wp-json\/wp\/v2\/categories?post=7608"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emi-bg.com\/en\/wp-json\/wp\/v2\/tags?post=7608"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}